CRANES + STRUCTURES / PROJECT EXPERIENCE

Batch-House Crane Arrangement

A maintenance crane was required above an operating batch-house, but structural records were incomplete. The proposed orientation restricted useful reach and the supplied crane interface did not match the existing supporting steel.

WHAT HAD TO BE PROVED

The revised base and existing supporting steel could carry the reactions after the crane was rotated for useful maintenance reach.

Hand calculations remained the design basis. A local finite-element model covered the new base plate, gussets and the first length of supporting steel—not the whole building. Its purpose was to examine load introduction that code formulae represent coarsely: local plate bending, weld-toe hot spots and whether the existing web required a stiffener.

LOAD INTRODUCTION / REVISED CRANE BASELOCAL MODEL EXTENT
COLUMN REACTIONBASE PLATEGUSSETWEBFLANGES

Column → plate → gussets → beam web and flanges → supporting connection and anchors

CHECKPURPOSESTATUS AFTER REVISION
Hand calculationsGlobal actions and member checksDESIGN BASIS
Local shell modelPlate bending and load introductionCHECKED
Weld detail reviewLoad path and weld-toe sensitivityREVISED
Existing beam webNeed for local stiffeningCHECKED
Fabrication interfaceFit to verified existing steelREVISED

WHAT THE ANALYSIS CHANGED

Crane rotated. Plate enlarged. Load transfer gusseted. Interface redesigned to the steel that was actually there.

ANONYMISED PROJECTFIGURES ARE REPRESENTATIVENOT CERTIFIED RESULTS