Gather the evidence
Walk the plant. Photographs, sketches, the drawings you have even if they are wrong. Measure the critical geometry. Record access, shutdown, hazards, and what has to keep running.
0433 597 205ENGINEERING APPROACH
Not a brochure process. Gather what the plant is doing, think from first principles, calculate, use software only when it answers a question, come back with a solution that can be fabricated.
Walk the plant. Photographs, sketches, the drawings you have even if they are wrong. Measure the critical geometry. Record access, shutdown, hazards, and what has to keep running.
What would count as solved. Load, duty, life, maintainability. Do not pick a product or a model first.
Load path. Free-body. Governing equation. Limit state. What the Standard actually asks. IQEG does this on the desk before a file is opened.
Hand calc first. FEA, DEM or CFD only where the question needs a field the hand calc cannot see. Software is a tool. It is not the answer.
Options that fit the envelope, the shutdown and the fabricator. Strength, fatigue, wear, access, installation sequence. A set that can be built.
Calculations, GA, fabrication, notes. Review, install, commission where the job needs it. Records kept.
WHY THIS WAY
Incomplete records are the job, not an exception. Measure first. The file is checked against the steel that is there.
A contour plot without a governing check is decoration. Hand calc first. FEA, DEM or CFD only when the question needs a field.
The output is calculations, GA and fabrication notes a workshop can use. Not a slide. Not a predetermined product.