ENGINEERING APPROACH

Evidence.
Governing check.
Buildable set.

Not a brochure process. Gather what the plant is doing, think from first principles, calculate, use software only when it answers a question, come back with a solution that can be fabricated.

01

Gather the evidence

Walk the plant. Photographs, sketches, the drawings you have even if they are wrong. Measure the critical geometry. Record access, shutdown, hazards, and what has to keep running.

02

Define the question

What would count as solved. Load, duty, life, maintainability. Do not pick a product or a model first.

03

Think

Load path. Free-body. Governing equation. Limit state. What the Standard actually asks. IQEG does this on the desk before a file is opened.

04

Calculate, then analyse

Hand calc first. FEA, DEM or CFD only where the question needs a field the hand calc cannot see. Software is a tool. It is not the answer.

05

Engineer the solution

Options that fit the envelope, the shutdown and the fabricator. Strength, fatigue, wear, access, installation sequence. A set that can be built.

06

Document and close

Calculations, GA, fabrication, notes. Review, install, commission where the job needs it. Records kept.

WHY THIS WAY

The plant is the drawing

Incomplete records are the job, not an exception. Measure first. The file is checked against the steel that is there.

Equation before model

A contour plot without a governing check is decoration. Hand calc first. FEA, DEM or CFD only when the question needs a field.

A set you can build

The output is calculations, GA and fabrication notes a workshop can use. Not a slide. Not a predetermined product.

IQ ENGINEERING GROUP

Bring the problem.
We will say what the job is.